Great Western Route Modernisation (GWRM)

Seconded into Network Rail, we managed two key aspects of the project to electrify the route between London and Bristol.

Firstly, Topographical and Geotechnical surveys were required of the existing bridge and station assets along the line of route in order to understand the full extent of design and works to prepare for the new rolling stock.

Secondly, station property alterations had to be planned at Bath Spa, Chippenham, Keynsham and Oldfield Park, including platform re-gauging, canopy alterations as well as the associated enabling permanent and temporary works.